10 year power purchase agreement in USD ($133/mwh)
• Project was grid connected and operational since 2019 with 2 years of proven production
$ 6.960.000 Project price
17.5% yearly return on equity, 5.8 Year payback ( Yearly Net income 1.2M$)
16,500+ high quality Mono Perc Panels
90,000 M2 Land included in the SPV
Project located in URFA, one of the best irradiation in Turkey
Project was built with ultra high quality materials including an Italian tracker system adding 18% to the
production

Monthly Income in USD paid in TL according to exchange rate

مشاركة: